|
|
RFP NO. 23900-RFP-EH492
Radiological Control Services
Download Instructions:
- Right-click the Request For Proposal link above and choose "Save Target As."
- Save the zip file to your local hard drive.
- Open the zip file from its saved location.
- In WinZip, click the Extract button.
- Specify a path to extract the files to and click Extract.
- Enter the password.
- Open the extracted coverletter.doc file to begin reading the RFP.
RFP Amendments:
Changes:
- Exhibit C, Form A-1, was revised to include CY 2010 for Base Year 2 in the Labor category. Also,
revised Pay Item 7 from $500,000 to $1,500,000 in the Other Costs category.
- Exhibit C, Proposal Response Form – Revised to read one-hundred, eighty (180).
- Instructions & Information to OFFERORS, Section 15, revised to read one-hundred, eighty (180).
- Instructions & Information to Offerors, Section 20: The physical address is Highway 58, Blair Rd.
Bldg. 1007, MS 7596, Oak Ridge TN 37830.
- Instructions & Information to Offerors, Section 21 includes the requirement to submit Exhibit C, Form
C-1 with the Technical Volume. Exhibit C, Form C-1 is now included.
- Exhibit C Cover Letter added the Form C-1 – LOWER TIER EXPERIENCE STATEMENT to the
Table Of Content page.
- The Org Chart, Fig 1 in the Misc folder is removed from the RFP.
- Exhibit B, Section SC-2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF THE WORK, Part E – language was revised.
Changes:
- Exhibit C, Form A-1, was revised to add the labor category Project Manager (WFT) line item 1.02 and adjust the remaining line items in the Labor section of this form. Also, addd footnote no. 2 to this form.
- Exhibit C, Form A-2, Pay Item No. 6 - Management Support Team was revised to replace the phrase "Pay Item 3.0" to "Pay Item 1.0".
- Provided procedure BJC-EH-5110, Biological Monitoring for Industrial Chemicals.
- Revise Exhibit C, Form Q - Statement 4 to include the value of "five" in the statement "number of years or are now in progress for the following owners or prime contractors.”
- Instructions & Information to OFFERORS, Position and Qualifications Section for Project Manager - revised the first line of required qualifications to read: "-15 or more years of applicable experience, including supervision of RCTs and/or IHTs."
Exhibit D revised qualifications for the Project Manager has been revised to reflect the same change as in Instructions & Information to OFFERORS.
- Exhibit B, Special Conditions - SC-11 titled "Contractor-Furnished Government-Owned Materials and Equipment" is hereby revised to include a listing of IT equipment (Attachment 8) that will be provided.
- Exhibit J, Wage Determination - SCA Wage Determination has been updated for this procurement with Wage Determination No. 2005-2493 dated 06/09/2008 and Wage Determination No. 1994-0520 dated 05/29/2008.
Changes:
- Exhibit C, Form B.1, was revised and will accept information.
PREQUALIFIED BIDDERS
- Philotechnics, Ltd.
- Safety & Ecology Corp.
- Eberline Services
- DeNuke Contracting Services
- Navarro Research and Engineering, Inc.
QUESTIONS AND ANSWERS
Questions?
Questions and Answers
11/19/2008
|
|
|
|
|